38 Everett St Repositioning

Narrative & Scope of Work
Completed complete building Mechanical system replacement of full electric heat pump system throughout with new lobby design to reposition the building. Previously Mulrooney a+d completed the existing conditions documentation via reality capture 3d laser scan utilizing the matterport pro3 camera. This allowed our team to work with the building owner to update the BOMA areas of the building and ensure accurate existing conditions plans and marketing plans were available for the building repositioning